You don't have javascript enabled. Good luck with that.
Pencarian
Cegah Genangan, Kali Petukangan Dikeruk

Petukangan River in Rawa Terate Dredged

East Jakarta Water Resources Sub-dept. dredges mud sedimentation and trash in Petukangan River, Rawa Terate, Cakung. This is done to increase river capacity.

I t is targeted this dredging can be finished in the end of April

"It is dredged for about 300 meters long, starting from Rawa Terate water gate to Krama Yudha Building's backside. It was dredged for one meter depth," said Yoserizal, Maintenance Section Head of East Jakarta Water Resources Sub-dept., Tuesday (4/4).

According to him, that river has already silted up. Thus in high intensity rain, it can not accommodate much water.

Utan Kayu River Dredged

"We deploy one mini amphibious excavator and one long arm in land. It is targeted this dredging can be finished in the end of April," he closed.

Linked News
Popular News indeks
  1. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye750 personBudhi Firmansyah Surapati
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye734 personAldi Geri Lumban Tobing
  3. Pramono Pushes for Partnership Between New Toto Tentrem and Tarakan Hospitals

    access_time24-08-2026 remove_red_eye665 personDessy Suciati
  4. Transjakarta Commits to Transport Equality Across the Seribu Islands

    access_time24-08-2026 remove_red_eye540 personAldi Geri Lumban Tobing
  5. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye511 personAldi Geri Lumban Tobing